From autozone.com:
1990-93 Accord
See Figures 2, 3 and 4
Disconnect the negative battery cable.
If so equipped, disable the Supplemental Restraint System (SRS).
Remove the glove box.Remove the glove box frame (lower support)
Fig. Fig. 2: Remove the glove box and frame
If not equipped with air conditioning:
Remove the three screws and remove the heater duct.
Remove the blower mounting nuts.
Unplug the wiring from the blower motor, resistor and recirculation control motor, then remove the blower assembly.
If equipped with air conditioning:
Lift the carpet in the passenger compartment.
Remove the side cover (kick panel).
Remove the control unit bracket nuts; unplug the five connectors and remove the control unit bracket.
Remove the retaining band, then remove the blower lower covers. Do not break the tabs on the lower covers.
Remove the retaining nuts and remove the blower assembly.
Fig. Fig. 3: Air conditioned models require the removal of the control unit. Handle it carefully
Fig. Fig. 4: Remove the lower covers from the blower unit
To install:
Install the blower unit and tighten the retaining nuts.
On air conditioned vehicles:
Install the lower covers and the retaining band.
Install the control unit bracket and carefully engage the wiring connectors to their proper location.
Install the kick panel and reposition the carpet. Connect the wiring to the blower assembly.
For non-air conditioned vehicles, install the air duct and tighten the screws.
Install the glove box frame and install the glove box. Note that some of trim on the frame is held with 2-sided tape; replace the tape when reassembling as necessary.If applicable, enable the SRS.Connect the negative battery cable.
×